Wednesday, June 6, 2007
Polly Wanna Urethane?
-Got the poly for a little cheaper than expected (thanks Rossi flooring in Sharpsburg! *coughplugcough*).
-Cleaned the floor with brooms, then damp towels.
-Buffed the floor by hand with "mouse" sanders and buffing pads (this was largely done by my mom and Molly, you guys are awesome).
-While they did the buffing I installed cork tiles on the stairwell landing. This needed to be done very tightly, so was a pretty big pain in the arse.
-Cleaned the floor again.
-Applied poly (this was a lot easier than expected and was basically pouring the poly on the floor and then using a roller on a stick to spread it.
-Waited to dry.
-Discovered that I'd missed several spots.
-Decided that we needed 3 coats.
-Put second coat on.
There were a lot more little specks of dirt, lint and stuff in the polyurethane than I would've liked. Between the first and second coats I picked some of the bigger ones out. Hopefully that's good enough.
After seeing that I'd missed areas when doing the first coat, I decided that I wanted to put 3 coats on, so that at least each spot has 2 coats. Luckily the poly spread a lot more than it said it would, so 4 gallons should get me 3 coats plus 1/4 gallon left! It's spec'ed at 350-400 sq feet per gallon, but we were getting an entire coat of 800-900 sq feet done in 1.25 gallons! *shrug*
The railings and final inspector are supposed to be coming Friday. In make sure the third coat can be walked on when those things happen I decidcedto go in tomorrow morning at 7 to put the third and final coat on (my mom agreed to come help despite being busy with other stuff!).
ok, gnite.
Monday, June 4, 2007
What Have I Done?
I've put so much effort and planning and time and sweat and thought into this project over the last two years, to see it finally come together is a strange feeling. Especially because it wasn't always going to be in this form.... I think back to the other places I've looked at and can't help but want to switch to the alternate dimension in which I chose to do those projects instead and see how they turned out.
Funny how I'm going to really miss making all these decisions and choices that I never would've thought I'd care about before the project began. I'd love to start looking for another place right now.... but unfortunately my income's brief stint in my bank account before going to house payments probably wouldn't allow it.
My roommate asked me the other day, "What if somebody just knocks on your door and offers you $300,000 for it?" The only way I'd consider it of course, was if I was given an indefinite amount of time to build a new place first... but even if that probably unrealistic hypothetical situation occured, would I really want to turn around and sell it before I've had the chance to "tweak" to my exact preferences and really settle into it for a bit? Probably not. But then again, if the price was high enough that I could then afford to do something even crazier with my next one.... maybe I would. Who knows.
Then after I've thought through all that stuff I get back to realizing how lucky I am to have been able to do this by having the parents that have spent all the time working on it with me and put faith in my decision (for the most part).... and to have all the friends I have that've offered their help.... and to work somewhere that's willing to be flexible with my work schedule enough to allow me to do this.... and to live in a city where you don't need to be a millionaire to own a house within the city limits...
And then I realize that there's no way I should be upset about not being able to immediately start building a second house.
Alright, time to enjoy some sleep on the fine couch here at my current place.
Sunday, June 3, 2007
Biggest. Post. Evar. ??
Since that occured things have gotten kicked into high gear.
Saturday morning at 7am I rented a U-Haul (it was only available then!) and moved the stuff from my current place and my parents' garage into the garage/basement of The Hotbox (see previous posts for explanation of the naming... whether this name sticks or not, we will see). I couldn't move things upstairs yet because the cork still needs two coats of polyurethane applied. I'll be doing that this week. It took 1.5 trips with the U-Haul from my current place and just one trip from my parents'. There's still a good bit of small things to bring over, but over the next week I'm going to be bringing a lot of them down in my car. The move took surprisingly less time than I thought and was over a bit after noon.
Here's a snap of all my stuff piled in the garage:

And here's my cat, Sanchez wondering where all the stuff in my old room went:
(It's pretty hilarious she'll just go into the room and meow while looking around, clearly confused that everything's gone.)Over the weekend workers were there much of the time, with Otto working till 10pm Friday night! (thanks Otto) There was a lot of joint compound, paint, and other general gunk on the colored concrete floor in the finished section on the first floor that had to be removed. Saturday night I went over and checked it out in order to give them approval to start the coating of it. This stuff was applied when the concrete was first poured (there are some blog posts related to this towards the begining of the blog), and seals the concrete, brings out the color which was mixed in with it, and allows it to be buffed, to create a polished look. I went over tonight to check it out and was really surprised at how much it changed the color! Over the course of the construction lots of dirt and dust have been ground into it, so that alone had lightened the color to almost a normal concrete gray, but the combination of cleaning that stuff off and coating it has really made a difference:

The other big thing I saw today was the installation of the bathroom countertop! The "Steel Gray" looks reallllly good with the black cabinets and black (with white speckles) tub surround. The continuity of the black works even better than I had planned. I think this is partially because of the little "seat"/storage area which we created at the end of the tub, under the countertop. It's not really a seat at all... it's more just a place to put things like soap, shampoo, etc, but it's similar to the seat that my parents' have at the end of their bathtub, so that's what we've been calling it. Unfortunately, this section is a bit of a tease because I didn't take a picture of it. The faucet isn't installed yet, and I wanted to wait to take the picture until it's all done.
(update: before posting this I went back the next day and it was done, so here's a pic)

As a consellation prize though, I took a picture of the half of the kitchen that's complete:

The oven sticks out a bit more than I'd like... but the countertop was already cut away more to try and move it back some, so I'm not sure what the problem is there. Aligning all the cabinet doors was a serious pain. At first I had no clue how to manipulate the hinges to make the doors move how I wanted. But when I finally got that down, it just got more frustrating. Having the two stacks of cabinets makes it so that once you adjust one door, you need to adjust three more to match it. Additionally, each door has three adjustments, and often times adjusting one means you have to re-adjust the other two.
The fridge is all hooked up and the water dispenser and ice maker are working! At first I thought there was a slight problem with the water dispenser squirting after the cup was removed, but it seems fine today. I also played around a bit with the controls on the front above the water dispenser: you can change the temperature by degree for the freezer or fridge, set an alarm/lock on it (so nobody can steal your beer??), and a setting with some crazy name like HyperIce.
In the garage area I wanted to have a crappy sink to wash out dirty/messy stuff, so I got a laundry tub w/ faucet and everything for like $60 at home depot/lowes:

I need to keep an eye on it in the winter, because it's in the unheated garage, but I doubt it will be an issue.
Here's a picture of the light in the guest bathroom on the second floor:

Toto toilets with the super G-force ultramax technology that I think I referred to before:
I'd been planning on working on the messed up section of the floor tonight with Otto, but when I called him early this evening to talk to him about it he said he dove into it and it turned out to be a lot easier than he expected. He was able to pull the tiles out, replace the messed up tiles and even only have to use one new tile in about 10 minutes! I was really happy this ended up not being as bad as it could've been. Had I not come over to check it out it would've kept coming in and sat there all night and caused who knows how much damage.Alright, well this post is long enough and I think I want to post a separate one about general thoughts on moving, etc.
Friday, June 1, 2007
One Day's Worth of Work
"One Day's Worth of Work"
(read previous post for explanation)
UXOR WAY – TO-DO LIST
As of June 1, 2007
GARAGE
- install garage door opener
- install laundry tub
- seal heads on side windows (3)
- seal around sliding door (inside and outside)
- level sliding door
- install sliding door’s screen
- remove construction debris
- sweep clean
REAR ELEVATION
- paint steel lintels (2)
- seal around window
- reset terra cotta coping on right CMU wall
- repair metal J below swinging door
- remove added wood below swinging door
- cover jambs with metal around swinging door
- clean windows and doors (4)
- remove extra mortar from concrete block joints
- install balcony railing
ENTRY/HALL
- Scrape, clean and buff concrete floors throughout (incl. powder room)
- seal concrete floors throughout (incl. powder room)
- install window sills (2)
- repair drywall under stairs
- install hardware and lock on entry door
- adjust furnace closet doors (left door hits right)
- set laundry valve box flush with wall
- repair corner bead to left of valve box
- install door stops (TK/AK)
- prime and paint repaired drywall (TK/AK)
POWDER ROOM
- install recessed toilet paper holder
- clean & seal concrete
- install towel bar (TK/AK)
STAIRS
- install railing and handrail
- repair drywall
- install luaun on landing
- install cork tiles on landing (TK/AK)
- cut baseboards for landing (TK/AK to install if cork is not installed yet)
- install transition at top stairs (TK/AK)
- polyurethane treads and risers (TK/AK)
BATH 1
- install hardware on pocket doors (2)
- install cultured marble joint pieces on tub
- install cultured marble countertop
- caulk transitions of cultured marble in all places
- install and connect faucet
- replace crystal diverter knob with chrome lever
- replace broken window slider catch
- move sills back to close gap
- install towel bars and toilet paper holder (TK/AK)
- install medicine cabinet (TK/AK)
- install closet shelving (TK/AK)
- install cabinet door pulls (TK/AK)
BEDROOM
- change direction on sliding door
- install balcony railing
- install quarter round
- buy pocket door hardware (TK/AK)
- install hardware on double pocket door
KITCHEN
- level partial wall, repair drywall and reinstall cap
- move range and refrigerator into place
- remove disposal
- exchange broken disposal (TK/AK)
- install new disposal
- install remaining cabinet doors (TK/AK)
- install quarter round (none behind range)
LIVING
- replace buckled cork tiles
- install hardware and lock on swinging door
- repair drywall around sliding door lock
- seal abandoned screw holes on sliding door jambs
- install pantry closet shelving (TK/AK)
- install quarter round
BATH 2
- replace broken tile
- hang door and install stops
- replace crystal diverter knob with chrome lever
- install toilet seat
- install hardware on door
- install vanity doors (TK/AK)
- install door stops (TK/AK)
-
No News is Good News?
I returned to the site the Tuesday after Memorial Day weekend to find very little accomplished and was pretty disappointed. I let the contractor know that I planned on moving my stuff into the back of the garage this weekend because I needed to move out of my room at my current place. When I explained that we still needed to put two coats of polyurethane on the floor before I moved things upstairs, he said there was only one day's worth of work left to do, so this should be fine.
After seeing the amount of work left to be done, I knew there was no way for this to be done in one day. I let the contractor know that there was much more than this to do and figured now that he was in the loop things would get rolling.
Wednesday night though, I still found nothing done.
Today (Thursday) I sent a reminder e-mail, along with a note about the bathroom countertop which is ready to be picked up.
At the end of the day a big rain storm was coming through.... my first thought was, "Hmm... I hope things are OK over at my house." Followed by, "Nah, I'm sure it's fine." After work I decided to go over to see the progress that surely had been made by now as well as ease my silly fears.....
...... to find the back door to the spiral stairs wide open and a huge puddle on the cork floor! And guess why the back door was open? Hmmm, could it be because one of the things still left to do that hasn't been gotten to is to put the back door knob and lock on?
I'd assume my sarcastic tone is making it obvious that I'm pretty pissed about this, but in case it wasn't clear: I am.
The transition between the two tiles directly in front of the door had taken water in, expanded, and swelled. Amazingly it only happened on this one seam, but because the water was coming in at the edge of the cork, water had seeped underneith the 5 tiles in the area around the door and the door casing also was wet. What will happen to these when they dry out, or over time, I really don't know. They might be fine, but I'm not sure. The two tiles with the swollen tongue and groove definitely need to be replaced though.
Because they're tongue and groove, removing just one or two tiles isn't possible (unless you cut off the tongue and groove, which is not "the right thing to do"). To do it right, the baseboards and door casing will have to be removed and a significant number of tiles will have to be removed and some of them will need to be replaced.
OK, that's all the bitching I have in me for now, but to wrap up: I plan on moving my stuff into the basement on Saturday and then as soon as the work upstairs is complete I need to polyurethane the floors and then move my stuff up.
Today wasn't a good day. (no comment on my use of AK's, please)
Tuesday, May 22, 2007
We Be Plumbing
I ran the water and checked to see if the instantaneous water heater was working yet....
... but it wasn't even plugged in. Oh well, at least it looks impressive. The washer and dryer will go under the water heater and to the left from the perspective of this picture. I only have a dryer now... so if anybody reading this has a not-horrible washing machine they want to get rid of, I could use one.
Tonight I had my first meal in the backyard with my mom (she took the picture):
I even made a little video of the microwave's first use to heat up our Qdoba, but I think I'm going to spare the general public and leave that on my computer.Tonight I finished adjusting the kitchen stainless wall cabinet doors. There's still a lot more that needs to be done (install and adjust glass cabinets above microwave, adjust drawers, install and adjust under sink doors), and there's no countertop yet, so I'm still withholding any pictures.
The bathroom cultured marble tub surround is installed now and it looks preeeeeeeetty awesome. I can't wait to see it with the steel gray countertop. The cabinets are installed as well, and although they look very nice, the laminate we got has a neat texture to it, that doesn't visually stand out. You can tell it's there if you look, and you definitely will be able to feel the difference though. That's probably for the best anyways, considering the busy-ness of the counter and surround. Pictures to come once installation comes nearer to completion.
Monday, May 21, 2007
Sunday Sunday Sunday

It's Sunday night... that means it's late and I'm putting off getting to sleep in order to do some updating. Before I do that though, let me just say that my two favorite characters on my other Sunday night activity the Sopranos and Entourage are Paulie and Johnny Drama.
So I've been going over to the house a good bit to work on stuff, and one of the biggest, but also least exciting tasks has been sanding and varnishing/polyurethaning the baseboards. My mom had always suggested we clearcoat/polyurethane the baseboards and trim etc rather than paint it like is normally done. Seemed fine to me, so I didn't think anything of it... untill we started, and I found out that doing that involves sanding, then painting on the polyurethane, then sanding, then more poly, then more sanding, then installing, then more poly and more sanding. It's quite the task, and if you don't put the polyurethane on just right it leaves funny marks on the wood. I'm getting better at it, but it was a struggle at first. (btw, don't ask me why it's called clear coating, varnishing, and polyurethaning.... but all three mean the same thing).

While over there today, I also picked up a bunch of the cardboard on the floor (to protect it) and swept a bunch of the saw dust up. I've been waiting to post good pictures of the floor until there's not much stuff on it and it's cleaned... but it's probably going to be a little bit before that happens, so I just went ahead and took this picture while it was the closest it's been in a little while:

The pattern turned out real nice. My only concern with it is it getting damaged because it's so soft. There were some small mess-ups with it from installation alone, and although there aren't that many workers going in and out of the upstairs, it's still taking wear and tear from all that's going on :/ I'm trying to leave lots of cardboard around to protect it, but I almost worry that because the cardboard's there, the workers think they can be more cavalier than they should be. I've found a few dents and scratches that definitely weren't there before.
The good news on that tip is that I started messing around with doing some patching of the cork. I cut out a little section on a scrap piece, then got some other cork, cut it up into pieces, jammed it in the section of missing cork, and coated it with polyurethane. Then I gently sanded it down flat, coated with more poly, etc etc. It didn't work perfectly, but it worked pretty well! With some practice (and I think maybe using a little glue initially), I should be able to patch it if bad things happen to it.
Another thing I've been working on, but withholding documenting quite yet are the kitchen cabinets. I drilled the handle holes, attached the handles and hung the doors this past week (after much thought and discussion into exactly how to position the handles) and this weekend I spent some time adjusting them so all the doors are spaced properly in relation to each other. The Ikea doors have three things that you can adjust to do this, and although they clearly show how to adjust each axis, it took a good bit of futsing about to figure out a good technique. The real problem is that if you change one thing, then you have to change 2 others on the same door, then if that changes how the door hangs in relation to the doors around it, you have to change all those. I'm doing a double stack of 24" tall cabinets too, so this makes the "surrounding doors" issue even worse. I finally got the hang of it today though and got a good bit done. Hopefuly I can get that finished up soon so I can take a proper photo n'at.
Alright, before I crash, here's a little video I took walking down the spiral stairs and into the patio. My mom brought over a little plastic table she got for free and some plastic chairs she got for a dollar, or something ridiculously as little. (Update: it seems as though the plastic table wasn't there when this was filmed... but don't worry, it's there now)
Friday, May 18, 2007
The Hotbox
My place looks a good bit like a railroad car, so I threw that into Wikipedia and then Ash found it.
Hotbox: An axle bearing that has become excessively hot due to friction.
It's great for my place because:
1 - Hotbox is a railroad car term
2 - My house quite boxy.
3 - My house is HOT (and this is why it's hot, hot; this is why it's hot).
4 - My house is red... like something hot.
5 - Just cause it's a cool term.
6 - etc
Tuesday, May 15, 2007
No-Party Time, Not Particularly Excellent
I talked with the head of the acoustics department at work about soundproofing it, and he basically said that if there's a garage door, the only thing I could do to keep sound from getting out would be to build a whole new wall inside the garage. This is pretty much out of the question because I want to leave room for at least two cars to park (I will have two for a small period of time, plus future owners may have two), and building a wall after that much space would leave very little room for partying anyways.
He often times is overly cautious about acoustics in general, so at first I passed his comments off as exageration.... until yesterday when I was in the back of the finished area (about 40 feet from the front) and I could hear two people standing in the street front of the garage door outside talking. Not only could I hear them, but I could hear them fairly well, and they weren't talking particularly loud. The garage door closes in a way that leaves gaps around the edges, and I would imagine is the way most garage doors function as well (this might even be a requirement to allow venting of fumes).
What this means is that the garage door will acoustically act like a screen door.
Considering that a few of my neighbors hate me, that sound will bleed out of the garage area all over, and that my upstairs would be destroyed if I had a party there............ I've pretty much come to the conclusion that parties at my house are almost definitely not going to happen. This really sucks. I like throwing parties at my house and was really looking forward to it. The plan from the start was to have the basement/garage be a party area.
I'm not saying that I won't try my hardest to find a way around this problem.... but I really don't think it's likely. My best thinking now would be large wrestling mats that I'd have to hang from the ceiling to the ground right in front of the garage door, and somehow make a seal between them and the walls. Don't ask me where I'd get these from, or where I'd store them... but ummmm.... yeah.
Anybody that read this want to offer up their house for me to throw parties at instead (couch (or bed) for me to crash on at the end of the party is required)?
Friday, May 11, 2007
Kitchens are a good thing
While working on the flooring Wednesday the appliances were delivered. After a small scare of the fridge not fitting up the stairs (!!!), they got everything into the kitchen area. We laid cardboard all over the floors to prevent scratching and it seems to have done a good job.



The microwave got installed today as well, but I don't have a picture of that. Unfortunately there will need to be an outlet in the cabinet directly above it, but thems the breaks, as they say.
To leave a little more of my personal touch on the house I wrote a note to future owners, and along with a dollar bill I sealed them with plastic and slid it under the cork tiles in the bedroom.