When I visited to take more pictures in the new year I was happy to find that the cieling of the first floor/floor of the second floor was up and the frame wall of the second floor was built and waiting to be stood up.
This is the front (obviously).
Trusses for the cantilevered section go lengthwise in relation to the house, not across the width like the other beams.
This is a little video I took while on the second floor that shows some of the neighboring backyards etc.
There's a huge, old, run-down police station across the street that I talk about a bit in this video.
No comments:
Post a Comment