While working on the flooring Wednesday the appliances were delivered. After a small scare of the fridge not fitting up the stairs (!!!), they got everything into the kitchen area. We laid cardboard all over the floors to prevent scratching and it seems to have done a good job.
Slide in range with convection feature:
The cabinets were going in at the same time, so it worked out perfectly timing wise:
The microwave got installed today as well, but I don't have a picture of that. Unfortunately there will need to be an outlet in the cabinet directly above it, but thems the breaks, as they say.
To leave a little more of my personal touch on the house I wrote a note to future owners, and along with a dollar bill I sealed them with plastic and slid it under the cork tiles in the bedroom.