Sunday, January 21, 2007

Constructing the New Floor

January 6, 2007

When I visited to take more pictures in the new year I was happy to find that the cieling of the first floor/floor of the second floor was up and the frame wall of the second floor was built and waiting to be stood up.

This is the front (obviously).

This shows the cantilevered bathroom section which will bump out from the front.

Trusses for the cantilevered section go lengthwise in relation to the house, not across the width like the other beams.

The constructed roof looking from the back to the front.


Rooftop view from the back of the building towards the front.



This is a little video I took while on the second floor that shows some of the neighboring backyards etc.


There's a huge, old, run-down police station across the street that I talk about a bit in this video.

Concrete Preparation

I took these pics a couple weeks later when I stopped by the site with some of my co-workers. All the demolition was complete, all the concrete which needed broken up and removed was gone, the walls for the concrete pour had been constructed, and the framing was being started on top of the side walls.







The concrete that's being poured on the first floor is going to be colored and polished. A dye is added to the concrete when it's being mixed, then afterwards a sealer is added to it and when it's all dry and ready, it's polished smooth. In the end it almost looks like marble. The color I chose is "rawhide".


Contractor Selection and Demolition

December 16, 2006

After getting a three bids on the project, I decided to go with Team Construction. Their bid came in a little bit more than the lowest bid, and a whole lot less than the highest bid. Through her architecture work, my mom's worked with a number of contractors, so she was able to choose only quality people to even give us prices. The owner/head of Team Construction is a guy named.... Guy. He's helped out since the begining of this process a lot, giving advice and approximations of the amount of effort that would go into each one, etc etc. Although this wasn't the only reason we chose to go with Team Construction, it was certainly a factor.

Demolition of the interior and roof of the garage happened within days of signing up with Team. Here are some pictures and video of the initial stages of demolition.






Pics of the original garage

Unfortunately I lost a lot of the pictures of the original garage when I got my computers stolen last summer, but here are some of the ones I do have:

The outside

Yes, that's right... there was an El Camino in there!

Here you can see the roof slats which I'll be re-using for the siding on the front of the house. You can also see the large cabinet that must have over 40 drawers that my mom and I are going to refinish. Apparently the cabinet's real wood and should look great when done.

Pictures of the area

Here's an overhead view of the area with a couple local points of intereste pointed out:


And here's a close-up of the imemdiate area:

Wednesday, January 17, 2007

Floor Plan Fun

(Note: click images to see them full size)

Floor Plan: 1st Floor:
If you start at the lower far right of this drawing you can see the front door and above that is the garage door. Through the front door you'll be in the entryway where a coat rack will be and the stairs leading to the second floor. Walk past the stairway and there will be a storage closet, then the furnace/HVAC room, then a washer and dryer, then a powder room. This whole area will be "finished" (drywall, heating etc). The rest of the first floor will be "unfinished" and will be a large garage. I should be able to leave room for my car plus a guest's car as well as have a large area for exercise equipment, games, more storage, who knows. At the end of the garage will be a set of sliding glass patio doors leading out into the patio. I was unsure during the planning phase, but once the roof was torn off I determined that the walls around the patio make it entirely private, yet open to the sky. For the time being I'll probably put a picnic table and grill out there, but in the future putting up a couple hammocks or even a hot tub are well within reason.

Floor Plan: 2nd Floor



Going from the first to the second floor, you go up the stairs, they make a right turn, and then you land on the second floor with the bedroom to your right and the rest of the house to your left. My bedroom is a decent size, though not huge. In it there is a window on the left that is in a box which bumps out of the front of the house. This is Sanchez's box so she can look out the window and I plan on getting her a nize fuzzy something or other to sleep on. To the right of that window are two large sliding glass doors which act as a psuedo balcony. There will be a railing in front of them, but it will be attached flat against the house so you can't actually walk out anywhere. The "master bathroom" is off this room. More details of this to come later, but it'll be pretty sweet and it will have a big walk-in-closet right off of it.

If you turn left after you land on the second floor, the kitchen will be to the left with the usual kitchen stuff. I'm hoping to get stainless steel cabinets mixed with wood cabinets from ikea for this, but the exact plan is yet to be determined, and I may end up going a different route. As of right now, the floor in the kitchen will be cork that my mom and I will lay ourselves, but this might get changed to VCT (vinyl composite tiles... sort of like a nice version of linoleum in tile form). Behind the kitchen is another full bathroom and walking past the kitchen will be the livingroom/diningroom/everything else. This will be done in hardwood and against the back wall there is another set of sliding glass patio doors on the left and then on the right is a regular door which will open to the spiral staircase going to the enclosed patio.

Tuesday, January 16, 2007

Floor Plan Time

(Note: Click all pictures to see a larger version)

Front Elevation:

The part that says "wood siding" will be done using old slats from the cieling of the original garage. The windows and doors will all be mill finish aluminum, meaning they will be unpainted with that smooth/rough metal like brushed aluminum sort-of. The wood sections around the windows on the second floor bump out from the rest of the building a foot and a half or so. After some debate I chose to use corrugated steel as the main siding for the house. I had/have some reservations about using this because it's being used in many other modern houses these days, so I hated to do something unoriginal, but in the end I decided that it really is the right thing to use to achieve the industrial look that I'm going for.

Back Elevation:

Not shown is that the first floor in the back will be concrete block, like the rest of the first floor, and the second floor will be in the same corrugated steel siding as described above. All doors and windows will be mill finish here as well. If it's not obvious, the pole and horizontal lines on the left hand side indicate a spiral staircase going from the back patio to the second floor.

Side Elevation:

Because the garage takes up nearly the entire property, I made an outside area by removing the roof over the last 16 feet and building a wall in what was previously inside the garage. This side elevation shows that the second floor doesn't take up the entire length of the building, but stops at this outside patio.

Monday, January 15, 2007

The Real Planning Begins


One thing I realized I haven't discussed up to this point is my mom's exact role in the project.
She works for Tai + Lee Architects and although not technically an architect she does most things a "real" architect does. Without her help and knowledge, none of this would have been possible (at least not with spending tens of thousands of dollars), and the end result would've been far less personal.

Although my mom and I had a pretty good idea of how the floor plan and general layout of the garage was going to be, now that we had the final legal approval it was start ironing out the details of the floor plans. Some of the big items in this area were:
  • Window selection and layout
  • Exterior siding type
  • Flooring
  • Skylight positioning
Next I'm going to post the final specs which we submitted with the architectural drawings to contractors to get bids.

Tuesday, January 9, 2007

The Legal Battle

I will do my best to keep this portion of the story brief, but no promises.

*September 2005*
After working out a price with the sellers of the property, my mom and I went to the zoning board and scheduled a time a month from then to come in and present my case to the Zoning Board. Prior to this hearing, a notice must be placed on the property to inform neighbors that the owner of the property is requesting a variance from the zoning code. This allows neighbors to attend the hearing and object to changes that they may think will negatively impact them.

*October 2005*
3 women from the neighborhood showed up at the hearing to object to my proposed plans. The unfortunate thing about this was that going into the hearing they knew nothing about my plans, nor did they pay attention at the hearing when my mom was going over the plans we'd come up with. My intention was to create a place for myself to live while at the same time rehabilitate an under-used piece of property. Instead, I was vilified to be an absentee landlord trying to make a quick buck by creating rental property on the Southside bandwagon. Considering some of the other crappy housing in the area, I can understand why they might have had reservations initially. However, after seeing that I was working on the project with my mother and listening to my reasons and visions for doing it, they still blindly objected, leaving my extremely frustrated.

The Zoning Board agreed and sympathized with me and after a couple of weeks I got notice that my request for a variance had been approved. At this point I began the various inspections which are customary before closing a real estate deal like radon, pest, building, etc. Everything seemed to be in order so in early December I set the date to make the actual purchase of 7 Uxor Way....

*December 2005*
Two days before this day came, I received notice in the mail that one of the neighbors who attended the hearing and her husband (a lawyer (!!)) were appealing the Zoning Board's decision. Should they win this case, I would no longer be allowed to build the 2nd floor addition. I immediately called off the closing and requested an extension of the sales agreement. After hours and hours of phone calls to city offices I determined that this process could take months and that indeed, if I started construction and the neighbors won their case, I would have to tear down the new construction.

My mom and I went back to the drawing board, trying to figure out a way to do the project as a one-story structure. In the end we did come up with a plan, but it was limited in many ways. Time was progressing and I needed to figure out whether I should go forward and risk purchasing the garage or let the neighbors win. After being advised by persons familiar with similar cases that the neighbors had little chance of overturning the Zoning Board's decision, I decided to go for it. Worst case scenario being that I would not be allowed to build anything and would have to re-sell it without altering it.

*August 2006*
9.5 months and a couple thousand dollars later the "few month" legal process was complete and the judge declined the neighbors' appeal, clearly stating that not only were their reasons for appeal not valid, but that there was precedence in previous state supreme court cases which stated that I didn't even need to get a variance to build vertically on an existing wall structure anyways! *sigh* oh well... it was an interesting process none-the-less. I could go into obscene amounts of detail about how I chose to go about defending myself in the court process and the reasons why their case was most likely just BS scare tactics, but at this point, it's time to get to the reason this blog was created: to keep a running log of the project itself and so people can track what's been going on. Although I'm still not "up to date", I promise that the next entry will have some real info on the garage (including pictures, w00t!) and what's being done to it. Till then... my bed awaits.

Monday, January 8, 2007

The Search Continues, and Uxor Way is found

After the detective agency, my mom and I looked through realty websites ourselves at first, but then began talking with Maureen States, a real estate agent for Neighborhood Realty in Regent Square right by my apartment and my parents' house.

To start with we looked at some regular houses in the Regent Square, Edgewood and Southside areas in case I changed my mind and wanted to do something more traditional. After looking a bit I still wasn't struck by anything. One day Maureen called very excited and told me she'd found the perfect thing for me. When I went to see her to take a look at the documents she'd printed out it turned out it was a large 20' x 72' garage that my mom and I had seen online before in the Southside but had dismissed it without looking at it closely.

We went and looked at it in person and my initial reaction was "it's really cool, but it's not big enough". My mom and Maureen though though it was plenty big and that I was crazy. At the time I envisioned having a work-out room, a studio room, a bed room, a TV room, an outside area, a roof deck etc etc. After we'd looked at it my mom and I drew it up a little and began to feel a bit better about it, though still a bit unsure. A little while later we went and revisited it and an architect friend of my mom's who live in the Southside nearby named Andrew Lang stopped by to check it out with us. He instantly could see its potential and had a very different plan than what we'd imagined: don't live in the garage portion... live above it. It was such a simple and obvious solution to a number of the problems we were stuggling with. Adding a second floor made significantly more room, allowed for light to be let in, left room for several parking spots and just gave much more flexibility and total worth to the end result.

The only two major downsides we saw to the property at this point was the fact that it's located in an alley and the difficulty of building the second floor. The alley it's in is one way, very narrow and allows parking on one side. It's narrow to the point that you definitely want to turn your mirror in when you park on it to avoid it being smacked off. It's a bit difficult to manuever down at first, but over time it's not a problem, and the other advantage of this is that it cuts down on traffic. If I go to sell it in the future, I imagine this aspect will scare some people away.... hopefully not everyone though :P

The other issue of building the second floor was difficult because of a zoning code which states that you are not supposed to build on the property line and walls of structure must be 5 feet set-back from the property line. The purpose of this is to avoid fires spreading from one building to the next. This law is fairly new, and so most buildings in the Southside, and many other areas do not adhere to it. Another code which is broken in many instances in the city is that you cannot add windows to walls already built on the property line, because again, it facilitates the spread of fire from one building to the next.

In her work my mom's dealt with situations like this where a code restrict a project and she knew that to get around this, we would need to get a variance from the City of Pittsburgh Zoning Board. Once I made the call that I did want to go forward with purchasing the building we spoke with Maureen and got her to write in our ofher to the seller of the garage that our purchase of the property would be contingent on me getting the approval to build the second floor. After agreeing on a price, the legal process began....... more on this to come soon.